Development of Platform Technology and Operation Management System for Design and Operating Condition Diagnosis of Fluid Machinery with Variable Devices Based on AI/ICT
Fund
Ministry of Trade, Industry and Energy
Period
May 2021 – Dec 2025 (4.7 years)
Summary
Representative Outcomes

Development of Improved Saddle Module for ‘PumpON’ Program
Fund
Nongovernment enterprise
Period
Oct 2020 – Sep 2021 (1.0 years)
Summary
Representative Outcomes


Design of 2-stage Centrifugal Impeller using Refrigerant + Design of High Capacity 2-stage Impeller for Turbo Refrigerant Compressor
Fund: Nongovernment enterprise + Nongovernment enterprise, Period: Mar 2020 – Nov 2020 (0.8 years) + Apr 2021 – Nov 2021 (0.7 years), Summary: -, Representative Outcomes: –
Design of LNG Centrifugal Pump (LP Pump) for Power Generation Facility
Fund
Nongovernment enterprise
Period
Jul 2019 – Nov 2019 (0.4 years)
Summary
Representative Outcomes


Design and Performance Evaluation of Fans for Air Purifiers + Design and Aerodynamic Performance Evaluation for Indoor Air Purifier Fan
Fund
Nongovernment enterprise + Nongovernment enterprise
Period
Apr 2019 – Feb 2020 (0.9 years) + Apr 2020 – Mar 2021 (1.0 years)
Summary
Representative Outcomes


Flow Characteristics Prediction Technique Development on the Transient Behaviour of a Pump-Turbine unit for Pumped Storage Power Plant
Fund
Public utility enterprise
Period
Feb 2018 – Jan 2020 (2.0 years)
Summary
Representative Outcomes

Development of Reversible Axial Fan for Forward Driving
Fund
Ministry of Trade, Industry and Energy
Period
Dec 2017 – Dec 2020 (3.1 years)
Summary
Representative Outcomes
Anti-stall Fin (ASF)


Moisture Removal with Hot Air Circulation in Head lamp for Automobile
Fund
Nongovernment enterprise
Period
Jul 2016 – Oct 2016 (0.3 years)
Summary
Representative Outcomes

Flow System Analysis and Optimum Blower Selection for Chip Testing Chamber
Fund
Ministry of Science, ICT and Future Planning
Period
Jul 2016 – Sep 2016 (0.3 years)
Summary
Representative Outcomes


Research of Optimum Operating Condition for DH Pump
Fund: Government enterprise, Period: Feb 2015 – Feb 2017 (2.1 years), Summary: -, Representative Outcomes: –
Study on Intelligent Design System and Optimum Operation Plan for Fluid Machinery
Fund: Ministry of Economy and Finance, Period: Jan 2015 – Dec 2015 (1.0 years), Summary: -, Representative Outcomes: –
Research Planning of Base Technology on Future Convergence Industry
Fund: Ministry of Economy and Finance, Period: Jan 2014 – Dec 2014 (1.0 years), Summary: -, Representative Outcomes: –
Development of High Pressure Multi-stage Centrifugal Pump for Descale Process in Hot Rolling by CFD
Fund: Ministry of SMEs and Startups, Period: Nov 2013 – Oct 2015 (2.0 years), Summary: -, Representative Outcomes: –
Development of Turbo Blower (2D) in Vacuum Cleaner
Fund: Nongovernment enterprise, Period: Aug 2013 – Jan 2014 (0.5 years), Summary: -, Representative Outcomes: –
Driving Efficiency Maximizing Technology of Pump/Blower Module for Energy Savings of Buildings
Fund: Ministry of Trade, Industry and Energy, Period: Jun 2013 – May 2016 (3.0 years), Summary: -, Representative Outcomes: –
Development of Design Program for Centrifugal and Mixed-flow Pump
Fund
Ministry of Trade, Industry and Energy
Period
May 2013 – Sep 2018 (5.4 years)
Summary
Representative Outcomes
PumpON (design tool, software)

Development of Series Design of Jet Fan for Tunnel using CFD
Fund: Ministry of Economy and Finance, Period: Jan 2013 – Dec 2013 (1.0 years), Summary: -, Representative Outcomes: –
Development and Performance Prediction of Impeller of Vacuum Pump for Ship
Fund: Ministry of Economy and Finance
Period: Jan 2013 – Dec 2013 (1.0 years)
Summary: –
Representative Outcomes: –

Development of Platform Technology of DAQ (Data Acquisition) System based on GUI
Fund: Ministry of Economy and Finance, Period: Jan 2013 – Dec 2013 (1.0 years), Summary: -, Representative Outcomes: –
Development of Small Blower for OTR
Fund: Nongovernment enterprise, Period: Nov 2012 – Sep 2013 (0.9 years), Summary: -, Representative Outcomes: –
CFD of Flow Pattern in FFU (Fan Filter Unit)
Fund: Nongovernment enterprise, Period: Oct 2012 – Dec 2013 (1.3 years), Summary: -, Representative Outcomes: –
Design of Cooling Pump for Rolling Roll
Fund: Ministry of SMEs and Startups
Period: Jun 2012 – May 2014 (2.0 years)
Summary: –
Representative Outcomes: –

Development of Turbo Blower for Vacuum Cleaner
Fund
Nongovernment enterprise
Period
Feb 2012 – Dec 2012 (0.9 years)
Summary
Representative Outcomes

Performance Analysis of Sirocco Fan for Secondary Cell Cooling
Fund: Nongovernment enterprise, Period: Feb 2012 – Mar 2012 (0.2 years), Summary: -, Representative Outcomes: –
Hydraulic Design and Performance Evaluation of Centrifugal Pump for Water-fountain
Fund: Ministry of Economy and Finance, Period: Jan 2012 – Dec 2012 (1.0 years), Summary: -, Representative Outcomes: –
Design of Sirocco Fan for Total Heat Exchanger and Analysis of Air Flow in an Installed Space
Fund: Ministry of Economy and Finance, Period: Jan 2012 – Dec 2012 (1.0 years), Summary: -, Representative Outcomes: –
Development of Simulation Platform Technology for Core Energy Machine based on CAE
Fund: Ministry of Economy and Finance, Period: Jan 2012 – Dec 2012 (1.0 years), Summary: -, Representative Outcomes: –
Development of Deepsea Offshore Plant System & Equipment
Fund: Ministry of Trade, Industry and Energy, Period: Dec 2011 – Apr 2012 (0.4 years), Summary: -, Representative Outcomes: –
Development of Vertical Shaft Mixed-flow Pump for High Efficiency and Optimum Suction Performance
Fund: Nongovernment enterprise, Period: Nov 2011 – Oct 2013 (2.0 years), Summary: -, Representative Outcomes: –
Commercialization and Series Design of Small High Speed Regenerative Blower for Fuel Cell
Fund: Ministry of Trade, Industry and Energy, Period: Oct 2011 – Sep 2013 (2.0 years), Summary: -, Representative Outcomes: –
Performance Analysis of Ventilating & Heating Sirocco Fan
Fund: Korea Research Council for Industrial Science and Technology, Period: Oct 2011 – Dec 2011 (0.3 years), Summary: -, Representative Outcomes: –
Design of Flow Rate Calculation Program for Small Blower
Fund: Nongovernment enterprise, Period: Oct 2011 – Oct 2011 (0.1 years), Summary: -, Representative Outcomes: –
Development of High Kinetic Pressure Ventilating Fan
Fund: Nongovernment enterprise, Period: Sep 2011 – Jan 2012 (0.4 years), Summary: -, Representative Outcomes: –
Design of Small Fan Tester
Fund: Nongovernment enterprise, Period: Sep 2011 – Sep 2011 (0.1 years), Summary: -, Representative Outcomes: –
Performance Evaluation of Axial DC Fan
Fund: Nongovernment enterprise, Period: Sep 2011 – Sep 2011 (0.1 years), Summary: -, Representative Outcomes: –
Green Part Production Based and Technical Support
Fund: Ministry of Economy and Finance, Period: Jan 2011 – Dec 2015 (5.0 years), Summary: -, Representative Outcomes: –
Development of Axial Pump
Fund
Nongovernment enterprise
Period
Jan 2011 – Apr 2012 (1.3 years)
Summary
Q: 81,756 m3/hour (1,362.6 m3/min), Ht: 6.1 m, N: 227 rpm, Ns: 2,160 (asian definition)
Representative Outcomes

Development of Impeller and Casing for Light-weighted Regenerative Blower
Fund: Ministry of Economy and Finance
Period: Jan 2011 – Dec 2011 (1.0 years)
Summary: –
Representative Outcomes: –


Platform Technique for Design of Energy Core Machine and Storage of Heating Energy
Fund: Ministry of Economy and Finance, Period: Jan 2011 – Dec 2011 (1.0 years), Summary: -, Representative Outcomes: –
Performance Test and Evaluation of Steam Trap
Fund: Nongovernment enterprise, Period: Dec 2010 – Apr 2011 (0.4 years), Summary: -, Representative Outcomes: –
Technical Support for Performance Test for Establishing Performance D/B of Regenerative Blower
Fund: Korea Research Council for Industrial Science and Technology, Period: Sep 2010 – Nov 2010 (0.3 years), Summary: -, Representative Outcomes: –
CFD and Performance Improvement of Large Capacity Pump
Fund: Nongovernment enterprise, Period: Sep 2010 – Nov 2010 (0.3 years), Summary: -, Representative Outcomes: –
Performance Test and Evaluation of Heating Capacity for Air-source Heat Pump
Fund: Nongovernment enterprise, Period: Jul 2010 – Jan 2011 (0.6 years), Summary: -, Representative Outcomes: –
Design Optimization of Fan for Hair Dryer + Development and Process Improvement of Fan for High Performance Hair Dryer
Fund
Nongovernment enterprise + Ministry of Economy and Finance
Period
Sep 2009 – Aug 2010 (1.0 years) + Jan 2011 – Dec 2011 (1.0 years)
Summary
Representative Outcomes

Technical Support with CFD for the Development of Sirroco Fan
Fund: Korea Research Council for Industrial Science and Technology, Period: Aug 2009 – Oct 2009 (0.3 years), Summary: -, Representative Outcomes: –
Performance Evaluation on Flexible Duct at Press and Vacuum Condition
Fund: Nongovernment enterprise, Period: Jul 2009 – Sep 2009 (0.3 years), Summary: -, Representative Outcomes: –
Development of Variable Speed Turbo Blower
Fund
Ministry of Economy and Finance
Period
Jun 2009 – Oct 2009 (0.4 years)
Summary
Representative Outcomes


Design and Performance Evaluation of Industrial Compressor
Fund: Nongovernment enterprise, Period: Feb 2009 – Jul 2011 (2.5 years), Summary: -, Representative Outcomes: –
Development of 100HP High Speed Turbo Blower
Fund: Nongovernment enterprise, Period: Feb 2009 – Apr 2009 (0.3 years), Summary: -, Representative Outcomes: –
Development of High Speed Compact Jet Fan
Fund
Ministry of Trade, Industry and Energy
Period
Dec 2008 – Sep 2011 (2.8 years)
Summary
Representative Outcomes


Development of Regenerative Blower for High Efficiency and Low Noise
Fund
Ministry of Trade, Industry and Energy
Period
Dec 2008 – Sep 2011 (2.8 years)
Summary
Representative Outcomes


Fan Design for Kimchi Refrigerator (Stand Type) + Development of Fan and Duct System for Stand-type Kimchi Refrigerator
Fund
Nongovernment enterprise + Nongovernment enterprise
Period
Jun 2008 – Jul 2008 (0.2 years) + Dec 2009 – Mar 2010 (0.3 years)
Summary
Representative Outcomes

Development of 13K Submerged Cargo Pump
Fund: Nongovernment enterprise, Period: Jun 2008 – Mar 2010 (1.8 years), Summary: -, Representative Outcomes: –
Performance Evaluation of High Speed Vane Mixed-flow Blower
Fund: Nongovernment enterprise, Period: May 2008 – Jul 2008 (0.3 years), Summary: -, Representative Outcomes: –
Development of Mixed-flow Pump for High Efficiency and High Suction Performance
Fund
Ministry of Trade, Industry and Energy
Period
Dec 2007 – Sep 2010 (2.8 years)
Summary
Representative Outcomes

Performance Evaluation of Flexible Duct
Fund: Nongovernment enterprise, Period: Dec 2007 – Jan 2008 (0.2 years), Summary: -, Representative Outcomes: –
Development of Axial Flow Fan for Cooling Condenser and Heat Sink
Fund
Nongovernment enterprise
Period
Nov 2007 – Jan 2008 (0.3 years)
Summary
Representative Outcomes



Development of Ventilation Fan for High Efficiency and Constant Air Volume
Fund
Korea Institute of Industrial Technology
Period
Sep 2007 – Aug 2008 (1.0 years)
Summary
Q: 200 m3/hour (±20 m3/hour), P: 150 Pa, 70 W, 43 dBA
Representative Outcomes
Performance test
Sep 2003 – Sep 2003 (0.1 years)
Jun 2004 – Jul 2004 (0.2 years)
Oct 2005 – Oct 2005 (0.1 years)
Oct 2006 – Nov 2006 (0.2 years)
Dec 2007 – Jan 2008 (0.2 years)
Mar 2008 – May 2008 (0.3 years)
Jul 2009 – Sep 2009 (0.3 years)
Jan 2010 – Feb 2010 (0.2 years)


Optimum Thermal Management System Design for LED Projector using CFD
Fund: Ministry of SMEs and Startups, Period: Jul 2007 – Jun 2008 (1.0 years), Summary: -, Representative Outcomes: –
Development of a Regenerative Type Blower for Fuel Cell
Fund: Nongovernment enterprise, Period: Jan 2007 – Oct 2007 (0.8 years), Summary: -, Representative Outcomes: –
Development of High Speed Axial Blower
Fund
Nongovernment enterprise
Period
Jan 2007 – Feb 2007 (0.2 years)
Summary
Representative Outcomes

Optimal Design of Fuel Pump Impeller and Volute
Fund
Ministry of Trade, Industry and Energy
Period
Dec 2006 – Oct 2007 (0.9 years)
Summary
Representative Outcomes

Comparative Test of Performance of Air Conditioners with Centrifugal and Plug Fans
Fund: Nongovernment enterprise, Period: Dec 2006 – Jan 2007 (0.2 years), Summary: -, Representative Outcomes: –
Design of an Impeller and Flow Systems for Electric Fuel Pump
Fund: Ministry of Trade, Industry and Energy, Period: Nov 2006 – Aug 2009 (2.8 years), Summary: -, Representative Outcomes: –
A Study on Effects of Hydraulic Performance on Pump Design Variables
Fund
Nongovernment enterprise
Period
Jul 2006 – Jun 2007 (1.0 years)
Summary
Representative Outcomes


Hydraulic Design and Analysis for Submerged Cargo Pump
Fund
Ministry of Trade, Industry and Energy
Period
Jun 2006 – Nov 2009 (3.5 years)
Summary
Representative Outcomes

Technical Support for Design and Performance Evaluation of Axial Fans for a Transformer Cooling
Fund: Ministry of Planning and Budget, Period: May 2006 – Oct 2006 (0.5 years), Summary: -, Representative Outcomes: –
Development of Dry System of Automatic Vehicle-washing Machine using Air Blower
Fund
Ministry of Planning and Budget
Period
Jan 2006 – Dec 2006 (1.0 years)
Summary
Representative Outcomes


Development of Side Channel Type Regenerative Blower
Fund: Nongovernment enterprise, Period: Oct 2005 – Sep 2006 (1.0 years), Summary: -, Representative Outcomes: –
Design Optimization of Fuel Pump for Vehicle
Fund
Nongovernment enterprise
Period
Oct 2005 – Mar 2006 (0.5 years)
Summary
Representative Outcomes


Performance Test of Centrifugal Fans for an Automobile Air Cleaner
Fund: Nongovernment enterprise, Period: Aug 2005 – Aug 2005 (0.1 years), Summary: -, Representative Outcomes: –
Design Optimization of Turbomachinery Blade using Inverse Design Method
Fund
Ministry of Planning and Budget
Period
May 2005 – Dec 2005 (0.7 years)
Summary
Representative Outcomes

Performance Test of Ventilation Fans for a Range Hood
Fund: Nongovernment enterprise, Period: Apr 2005 – May 2005 (0.2 years), Summary: -, Representative Outcomes: –
Performance Test of Centrifugal Fans for an Incinerator
Fund: Nongovernment enterprise, Period: Dec 2004 – Dec 2004 (0.1 years), Summary: -, Representative Outcomes: –
Technical Support for Development of Low Noise and High Performance Range Hood
Fund: Ministry of Trade, Industry and Energy, Period: Sep 2004 – Aug 2005 (1.0 years), Summary: -, Representative Outcomes: –
Improvement of Pump Efficiency and Performance Characteristics
Fund: Nongovernment enterprise, Period: Aug 2004 – Aug 2005 (1.1 years), Summary: -, Representative Outcomes: –
Performance Test of Axial Fans for a Transformer Cooling
Fund: Nongovernment enterprise, Period: Feb 2004 – Mar 2004 (0.2 years), Summary: -, Representative Outcomes: –
Technical Support for Development of High Efficiency Kitchen Ventilation System
Fund: Ministry of Trade, Industry and Energy, Period: Jul 2003 – Jun 2004 (1.0 years), Summary: -, Representative Outcomes: –
Application of CFD to the Design of High Efficiency Compressor
Fund: Nongovernment enterprise, Period: Jul 2003 – Sep 2003 (0.3 years), Summary: -, Representative Outcomes: –
Flow Analysis of a High Efficiency Centrifugal Compressor for Turbo Refrigeration
Fund
Nongovernment enterprise
Period
Apr 2003 – Jun 2003 (0.3 years)
Summary
Representative Outcomes


Development of Humidity-controlled Cabinet
Fund: Ministry of Planning and Budget, Period: Nov 2002 – Jun 2004 (1.7 years), Summary: -, Representative Outcomes: –
Design and Performance Analysis of Diffuser for High Efficiency Turbo Chiller
Fund: Nongovernment enterprise, Period: Nov 2002 – Jan 2003 (0.3 years), Summary: -, Representative Outcomes: –
Design and Performance Evaluation of Gas Type Shock Absorber for Vehicle
Fund: Ministry of Planning and Budget, Period: Jun 2002 – Dec 2002 (0.6 years), Summary: -, Representative Outcomes: –
Design and Performance Evaluation of Vehicle Fuel Pump
Fund: Nongovernment enterprise, Period: May 2002 – Dec 2002 (0.7 years), Summary: -, Representative Outcomes: –
Development of Leakage-free Automatic Discharge Connection System for Submersible Motor Pump
Fund: Ministry of Planning and Budget, Period: Oct 2001 – Dec 2002 (1.3 years), Summary: -, Representative Outcomes: –
Design and Performance Evaluation of Space-saving and Low-noise Air Conditioners using Diversification of Air Inflow Direction
Fund: Ministry of Trade, Industry and Energy, Period: Aug 2000 – Jul 2002 (2.0 years), Summary: -, Representative Outcomes: –
Design and Performance Evaluation of High-jet Nozzles
Fund: Nongovernment enterprise, Period: Jul 2000 – Jul 2000 (0.1 years), Summary: -, Representative Outcomes: –
Design and Performance Evaluation of Fuel Pumps for Helicopters
Fund: Ministry of Trade, Industry and Energy, Period: Oct 1999 – Nov 2001 (4.2 years), Summary: -, Representative Outcomes: –
Development of Ultra-low-speed Underwater Agitator for Anaerobic Treatment
Fund: Ministry of Planning and Budget, Period: Jul 1998 – Oct 1999 (1.3 years), Summary: -, Representative Outcomes: –
Development of Hydraulic Design System for High Performance Pumps
Fund: Ministry of Trade, Industry and Energy, Period: Oct 1997 – Oct 2000 (3.1 years), Summary: -, Representative Outcomes: –
Development of Ventilation System for High-Speed Train
Fund
Ministry of Construction and Transportation
Period
Dec 1996 – Oct 2000 (3.9 years)
Summary
Representative Outcomes

Development of Plastic Airfoil Type Turbo Fan
Fund: Ministry of Planning and Budget, Period: Jun 1996 – Oct 1997 (1.4 years), Summary: -, Representative Outcomes: –
Basic Research on Design and Performance Prediction of Centrifugal Compressor Rotor
Fund: Ministry of Planning and Budget, Period: Apr 1996 – Mar 1997 (1.0 years), Summary: -, Representative Outcomes: –